The Party Wall etc. Act 1996 doesn’t have to come with premium price tags. Most projects are straightforward; the trick is choosing the right professional, on the right terms, at the right price. Here’s a practical, no-nonsense guide to keeping costs sensible—without sacrificing quality or compliance.

1) Shop around

Don’t stop at the first quote. Ask at least three firms for written proposals that set out: scope, timelines, who will be served, what’s included/excluded, and the exact deliverables (valid notices, service evidence, Award where needed). Comparing like-for-like exposes padded “extras” and vague scopes that later balloon into fees. Good firms are used to being compared—and welcome it.

2) Always get a fixed fee

Hourly rates incentivise drift; fixed fees incentivise completion. Insist on:

  • A fixed fee for notice preparation and service.
  • A fixed fee for Agreed Surveyor administration (if applicable).
  • A clear, capped structure for the two-surveyor route (your side fixed, the neighbour’s surveyor fee estimated and managed).
  • The trigger points for any extras (e.g., design changes, additional neighbours discovered, complex structural queries).

If a firm won’t fix or cap core tasks, that’s a red flag.

3) Demand full transparency on notice responses and costs

A credible surveyor will explain, in writing, what happens under each neighbour response—and what you might pay:

  • Consent: typically, the lowest-cost route; no Award.
  • Dissent with an Agreed Surveyor: one surveyor acts for both; faster and cheaper than two surveyors.
  • Dissent with two surveyors: sometimes necessary, but your surveyor should actively manage the other side’s hours and keep things proportionate.
  • No response: the Section 10(4) pathway should be costed and described (including reasonable attempts at contact and evidence of valid service).

If the cost implications of each path aren’t crystal clear before you instruct, walk away.

4) If the quote feels chunky, look elsewhere

Big numbers at proposal stage rarely shrink later. High fees may be justified on complex projects (deep basements, heavy temporary works, difficult access, multiple leasehold interests). But for a conventional loft, rear extension or standard underpinning, there’s no reason you can’t find clear, modest, fixed pricing. Vote with your feet.

5) Make sure the surveyor is genuinely qualified

This is where many owners overpay for under-delivery. The Act’s definition of “surveyor” is broad, which means anyone can call themselves one. Membership organisations like the FPWS are not the same as a regulated professional qualification. Look for:

  • RICS chartered status (MRICS/FRICS) and an RICS-regulated firm
  • Real party wall case experience and building pathology knowledge
  • Transparent complaints procedure and conduct standards

Inexperienced or unregulated surveyors can cost you more through mistakes, invalid notices, poor service of owners, or awards that invite appeals. Cheap at first, expensive later.


What “cost-effective” looks like in practice

Simple Survey’s transparent pricing (UK-wide):

  • Party Wall Notice service: £25 per adjoining ownership (multi-notice bundles discounted)
  • Act administration as Agreed Surveyor (single surveyor): typically £300 fixed-fee (depends on complexity and number of notices/owners)
  • Two-surveyor route (we act for the Building Owner): fixed-fee proposals from £325 for our side (and we work to keep your neighbour’s surveyor’s hourly fees reasonable and contained)

What you get for your money:

  • Proper notice scoping (we confirm exactly what’s notifiable)
  • Correct owner identification (including leaseholders)
  • Valid service under Section 15 with evidence
  • Clear explanation of response options, timings and likely costs
  • Calm, professional neighbour engagement to keep matters cooperative
  • Efficient, proportionate Awards when needed—no padding, no drama

Bonus tips to keep fees down

  • Have accurate drawings ready (especially for Section 6 excavations). Missing sections = delay and cost.
  • Talk to your neighbour early. A friendly heads-up often leads to a consent or an Agreed Surveyor.
  • Use hand tools where practicable. Many Awards will require this around party structures—less vibration, fewer damage claims, lower downstream costs.
  • Stick to the design. Mid-build changes can trigger new notices or Award variations.

Ready to avoid inflated fees?