Got a Party Wall Letter? A Guide for Neighbours

A letter from a Party Wall Surveyor about works next door can feel unsettling. The Party Wall etc. Act 1996 sets out clear rights and procedures—once you know them, it’s much easier to decide what to do.

First things first: what landed on your doormat?

  • Formal Party Wall Notice (legal document): move to the response options below.
  • Marketing/intro letter from a surveyor: some firms contact Adjoining Owners after checking planning applications. You’re under no obligation to engage them.
    Whenever possible, speak to your neighbour early; a quick chat can clear up misunderstandings and reduce friction.

If anything is unclear, take independent advice—don’t rely on one view.

Which notice is it?

Different notices cover different types of work:

  • Section 1 – New wall on or at the boundary (line of junction).
  • Section 2 – Alterations to an existing party structure (party walls/floors).
  • Section 6 – Excavation within 3–6 metres of your building (depth-dependent).

A compliant notice should explain what’s planned, when it may start, and how your property could be affected.

Your decision window

You normally have 14 days from service to reply in writing:

  • Consent – You’re content for the works to proceed without an Award.
  • Dissent – You want formal protections in place; this triggers appointment of surveyor(s) and the making of an Award.

If you need more detail before deciding, ask for drawings, methodology, and sequencing.

If you dissent: choosing surveyor arrangements

Two routes:

  • One Agreed Surveyor acting impartially for both owners; or
  • Each owner appoints their own surveyor (who can call on a third surveyor if needed).

What happens next:

  • The surveyor(s) draft a Party Wall Award setting out scope, safeguards, access, working hours, and what happens if issues arise.

Read the Award like a contract of protections

Once served, check for:

  • How the works will be carried out and when
  • Access and site conduct provisions
  • Damage procedures and timeframes
  • Any special protections (monitoring, method statements, temporary works)

It’s designed to let the project proceed while protecting your property.

If damage occurs: remedies and compensation

Under the Act and the Award, you’re entitled to making good or compensation if the works cause loss or damage. The Award should explain how to notify, how it will be assessed, and how settlement is determined.