Faster Party Wall Awards

Delays in party wall procedures can stall programmes, increase prelims, and strain neighbour relations.

The good news: with the right workflow, most domestic projects can progress to a robust party wall award swiftly—often within the statutory window—without sacrificing compliance or clarity.

This article sets out a practical, professional route to faster awards, together with transparent pricing and a realistic timeline.


What actually slows awards down?

  • Invalid or vague notices (wrong owners, missing content, incorrect sections cited).
  • Late or piecemeal information (design changes after notice; unclear methodology).
  • Unfocused correspondence that balloons into multiple side issues.
  • Unnecessary escalation (wide referrals instead of narrow, well-framed points).

Our approach removes those friction points: precise notices, complete information up front, proportionate drafting, and escalation only when strictly necessary.


Our fast-track method

1) Diagnose the legal triggers correctly
We tie each proposed element to the correct section(s) of the Act (Section 1, 2 or 6). Precision at this stage prevents scope disputes.

2) Serve valid notices on day one
Correct parties, compliant content, clear descriptions, correct lead-in period (two months for Section 2; one month for Sections 1 and 6). Where the Act allows, we use electronic service to maintain momentum.

3) Keep communication calm and clear
Neighbours respond faster when the paperwork is intelligible. We write in plain English and answer reasonable queries promptly.

4) Select the fastest lawful route

  • Agreed Surveyor (one impartial surveyor for both sides) is usually the quickest and cheapest.
  • If two surveyors are appointed, we maintain a tight, focused brief and avoid letter-tennis.

5) Draft proportionate awards
Authorise the notified works, set practical conditions, define access and logistics, and avoid kitchen-sink clauses. Proportionate drafting is quicker to agree and easier to follow.

6) Escalate narrowly (if needed)
Where a referral is unavoidable, we frame a single, precise question to the Third Surveyor. Narrow questions = faster answers.


Transparent, market-leading pricing

ServiceWhat’s includedOur fee
Party Wall Notice service (per adjoining ownership)Correct forms, content & timing; service plan£25 (multi-notice bundles discounted)
Act administration as Agreed SurveyorFrom dissent to a proportionate awardTypically £300 fixed (depends on complexity & number of owners)
Two-surveyor route (we act for the party doing the works)Fixed-fee proposal covering our side end-to-endFrom £325
Complex works (deep excavations, multi-owner blocks)Same fixed-fee philosophy; proportionate draftingFixed as above
Billing policyItemised scope, firm totalsNo surprises, no creeping extras

Time chart: how we compress the programme

StageStatutory/typical durationHow we keep it fast
Notice drafting & validation0–1 working dayPre-built templates, correct parties, clear scope
Service of noticesSame/next working dayElectronic service where permissible; postal proof where needed
Initial response window14 daysNeighbour-friendly covering notes; prompt Q&A
Non-response follow-up (s.10(4))10 daysIssued immediately on day 15 to avoid drift
Award preparation & agreement3–7 working days (typical)Proportionate drafting; focused issues only
Service of awardSame day digital service where permittedCoordinated service so appeal windows align
Appeal window14 days (set by the Act)Drafts that minimise appeal risk by being clear and balanced

Reality check: the notice period itself is fixed by statute (two months for Section 2; one month for Sections 1 & 6). Our job is to make everything around it seamless so you’re ready to proceed as soon as the period expires.


Why our awards complete faster

  • Correct first time: Valid notices and precise scoping remove the most common reasons for delay.
  • Plain English: Clear, proportionate awards are agreed quicker because they minimise ambiguity.
  • Digital by default: Where lawful, we sign and serve electronically to compress downtime.
  • Tight escalation: If a referral is needed, we keep it laser-focused to avoid weeks of debate.

FAQs

Is an Agreed Surveyor always quicker?
In most domestic matters, yes. One impartial surveyor and a proportionate award typically outpace two-surveyor appointments.

Can my neighbour force me to use their surveyor?
No. Each side may appoint their own surveyor, or both may jointly appoint a single Agreed Surveyor—by mutual consent only.

What if the neighbour ignores the notice?
After 14 days, we issue the 10-day follow-up under Section 10(4). If still no reply, the Act allows the process to continue—no indefinite limbo.

Who pays?
Typically, the party carrying out the works pays the reasonable costs of administering the Act. Any apportionment or exceptions are set out in the award.

Do complex foundations or multiple neighbours slow everything down?
They can—but we keep momentum with correct owner identification, coordinated service, and proportionate drafting. Our fixed-fee model still applies.

How soon should I start?
Work backward from your target start date: add the statutory notice period (one or two months) plus time for responses and award drafting. We can begin notices within 24 hours of instruction.


The bottom line

Faster party wall awards are the product of precision, proportion and pace—not corner-cutting. With Simple Survey, you get all three, at the lowest like-for-like cost in England & Wales.

Get a fixed, itemised quote today: email team@simplesurvey.co.uk.